Post-tensioned concrete allows thinner slabs, longer spans, and reduced material use. Sheger Architect designs PT systems, supervises stressing operations, and coordinates delivery of tendons, anchors, and specialist installation.
- PT slab and beam systems
- Stressing and grouting control
- Material and specialist delivery
